DeletedUser1021
Guest
Just a little something that poped in my head.
(For premimum users)
When you have buildings assigned in the que waiting to be built and your need suddenly changes.
eg your rallypoint gets catted
you can change the order of building que by pressing on an up or down arrow next to each assignment.
Or the method that is used for moving quickbar links.
Making the rallypoint the next building to be built after the current one.
This will mean that players no longer have to cancel thier current builds to assign the new building they need.
Saving lots of waste on resources and it the cases of destroyed warehouse/farm levels,not being able to
reassign buildings from these buildings now being too small.
(For premimum users)
When you have buildings assigned in the que waiting to be built and your need suddenly changes.
eg your rallypoint gets catted
you can change the order of building que by pressing on an up or down arrow next to each assignment.
Or the method that is used for moving quickbar links.
Making the rallypoint the next building to be built after the current one.
This will mean that players no longer have to cancel thier current builds to assign the new building they need.
Saving lots of waste on resources and it the cases of destroyed warehouse/farm levels,not being able to
reassign buildings from these buildings now being too small.